|
|
 |
 |
|
 |
 |
 |
 |
 |
 |
| 1 |
LNG Sampling
System |
1997 |
Assembly; BD,DD
& Fabrication,
Start up |
KGC
Pyeongtaek |
CEXI |
| 1999 |
Assembly;BD,DD
& Fabrication,
Start up |
KGC
Incheon |
Advanced
Control +
Ilshin |
| 2001 |
Assembly;BD,DD
& Fabrication,
Start up |
KGC
Incheon
Pilot plant |
ACPL |
| 2002 |
Assembly;BD,DD
& Fabrication,
Start up |
KGC
Tongyoung |
ACPL |
| 2005-2006 |
Assembly BD, DD
& Fabrication,
Startup |
POSCO
Kwangyang |
Self |
| 2005 |
LNG Tank sampler
Assembly BD, DD |
POSCO Kwangyang |
Self |
| 2007 |
Assembly BD, DD
& Fabrication,
Startup |
KGC
Pyeongtaek |
Self |
| 2 |
Nitrogen System
Package |
1995 |
Assembly; BD,DD
& Fabrication,
Start up |
KGC, Incheon |
PEI,CEXI,
CCI |
| 2001 |
Assembly; BD,DD
& Fabrication
Start up |
KGC
Tongyoung |
Ilshin
Hanjung |
| 3 |
Odorant System Package |
1996 |
BD,DD & Local Fabrication,
Start up |
KGC, Incheon |
Advanced
Controls |
| 4 |
LNG Trailer 3 sets |
1992 |
BD,DD & Local
Vehicle Type Permission |
KGC Pyeongtaek |
MVE |
| 5 |
Gas Heater,
Electric Heated |
1995 |
BD,DD & Start
up Supervision |
KGC, Incheon |
CEXI |
| 6 |
Gas Heater,
Steam Heated |
1996 |
Basic Design,
Detailed Design & Fab |
KGC, Incheon |
MS Eng'g |
| 7 |
Odorant System
Package, Low pressure |
1996 |
BD,DD & Fab.
Start up |
KGC, Incheon |
Self |
| 8 |
Fire Fighting
System |
1996 |
BD,DD & Start,
Acoustic Encl.
Gas Turbine |
KGC, Incheon |
NK |
| 9 |
LNG Vessels |
1996 |
BD,DD & Heater Tracing,
Test
and Insulation |
KGC, Incheon |
Hanjung |
| 10 |
LNG Vessels |
1998 |
BD,DD & Heater
Tracing, Test
and Insulation |
KGC, Incheon |
Hanjung |
| 11 |
Flare Stack |
1996 |
BD,DD & Procurement |
KGC, Incheon |
Advanced
Controls |
| 12 |
LNG Satellite |
2002 |
BD, DD & Part supply |
Kyungbuck City
Gas, Andong |
Self |
| 13 |
LNG Satellite |
2004 |
BD and part supply |
Kyunam Energy
Geoje Satellite |
Self |
| 14 |
Other Basic Design Experience;
1. Sea Water Heater & Pump -Contrapol
2. Submerged LNG Vaporizer -CEXI
3. In-line Gas Heater, Direct Fired -Cryoquip
4. Fire Fighting School -TEEX
5. LNG Satellite -KGC Pyeongtaek Quarter
6. LNG Atmospheric Vaporizer -Choongnam City
Gas |
|
|
 |
|
| |
 |
|
 |
 |
 |
 |
 |
 |
| 1 |
CNG Station
150 buses a day |
2001. 04 |
BD, DD &
Consulting |
Samchully City Gas-
Suwon, #1 |
Intermech &
KwangShin |
| 2 |
CNG Station
100 buses a day |
2001. 10 |
BD, DD &
Consulting |
Samchully City Gas
Bucheon, |
Intermech &
KwangShin |
| 3 |
CNG station
100 buses a day |
2002. 03 |
BD, DD &
Consulting |
Samchully City Gas
Incheon |
Intermech &
KwangShin |
| 4 |
CNG Station
100 buses a day |
2001. 10 |
BD, DD &
Consulting |
Simin Bus,
Masan |
KwangShin,
Intermech |
| 5 |
CNG Station
150 buses a day |
2002. 06 |
BD, DD &
Consulting |
Samchully- City Gas
, Suwon #2 |
KwangShin,
Intermech |
| 6 |
CNG Station
100 buses a day |
2003. 08 |
BD, DD &
Consulting |
Samchully City Gas
Wolmido |
KwangShin,
Intermech |
| 7 |
CNG Station
100 buses a day |
2002. 08 |
BD, DD &
Consulting |
Samchully City Gas
Kwangmyung |
KwangShin,
Intermech |
| 8 |
CNG Station
100 buses a day |
2002. 10 |
BD &
Consulting |
Daehan City Gas-
Kangdong |
KwangShin,
Intermech |
| 9 |
CNG Station
150 buses a day |
2002. 08 |
BD &
Consulting |
Daehan City Gas
Sungnam |
KwangShin,
Intermech |
| 10 |
CNG Station
100 buses a day |
2002. 06 |
BD &
Consulting |
Daegu City Gas
Dongho |
KwangShin,
Intermech |
| 11 |
CNG Station
100 buses a day |
2003. 06 |
BD &
Consulting |
Daegu City Gas
Maegok |
KwangShin,
Intermech |
| 12 |
LCNG Trailer
50 buses a day |
2002. 06 |
BD, DD &
Engineering |
ENT Korea |
Hanjung
Cryomec &
Cryoquip |
| 13 |
CNG Station
150 buses a day |
2003. 06 |
BD, DD & Engineering |
Daewon Bus
Namayangju |
KwangShin
Intermech |
| 14 |
CNG Station
150 buses a day |
2003. 12 |
BD, DD & Engineering |
Daewon Bus
Euijungbu |
KwangShin
Intermech |
| 15 |
CNG Station
100 buses a day |
2003.10 |
BD, DD & Engineering |
Kunsan City Gas |
KwangShin
Intermech |
| 16 |
CNG Station
100 buses a day |
2003. 12 |
BD, DD & Engineering |
Samchully
Bono |
KwangShin
Intermech |
| 17 |
CNG Station
100 buses a day |
2004. 03 |
BD, DD & Engineering |
Shina City Gas
Jinju |
KwangShin
Intermech |
| 18 |
CNG Station |
2004. 02 |
BD, DD & Engineering |
Daegu City Gas
Bumul |
KwangShin
Intermech |
| 19 |
CNG station
Mother station |
2004. 01 |
BD, DD & Engineering |
CanZhou City Gas
China |
KwangShin
Intermech |
| 20 |
CNG station
Daughter station |
2004. 02 |
BD, DD & Engineering |
SINOPEC
Xinjinag, China |
KwangShin |
| 21 |
CNG station
100 buses a day |
2004. 06 |
BD, DD & Engineering |
Shina City Gas
Jinju |
KwangShin |
| 22 |
CNG station
100 buses a day |
2004. 10 |
BD, DD & Engineering |
Suncheon Bus
Suncheon |
KwangShin |
| 23 |
CNG station
100 buses a day |
2005. 03 |
BD, DD & Engineering |
Yeosu Gubong Gas
Yeosu |
KwangShin |
| 24 |
CNG station
Added 50 buses a day
on 100 buses a day |
2005. 04 |
BD, DD & Engineering |
Haeyang City Gas
Chundan, Kwangju |
KwangShin |
| 25 |
CNG station
200 buses a day |
2005. 04 |
BD, DD & Engineering |
Incheon City Gas
Incheon Ariport |
KwangShin |
| 26 |
CNG Station
100 buses a day |
2006. 09 |
BD, DD & Engineering |
Seorabul City Gas
Choonghyo |
KwangShin |
| 27 |
CNG Station
100 buses a day |
2006. 10 |
BD, DD & Engineering |
Daewoo Bus
Ulsan |
KwangShin |
| 28 |
CNG Station
200 buses a day |
2006. 10 |
BD, DD & Engineering |
Haeyang City Gas
Baekgye |
KwangShin |
| 29 |
CNG Station
100 buses a day |
2007. 02 |
BD, DD & Engineering |
Taegu City Gas
Kyungsan |
KwangShin |
| 30 |
CNG Station
100 buses a day |
2007. 05 |
BD, DD & Engineering |
Seoul City Hall |
KwangShin |
| 31 |
CNG Station
100 buses a day |
2007. 01 |
BD, DD & Engineering |
Kyungwon Bus
Oido, Ansan |
KwangShin |
| 32 |
CNG Station
100 buses a day |
2007. 05 |
BD, DD & Engineering |
Kyungwon Bus
Sungok, Ansan |
KwangShin |
|
|
| |
 |
|
 |
 |
 |
 |
 |
 |
| 1 |
Acetylene Plant
System 50Nm3/hr |
1997 |
Assembly;BD,DD
& Fabrication,
Start up |
Hyundai Vinashin Shipyard
Vietnam |
Dawin |
| 2 |
Air Separation Plant
380Nm3/hr
HP Oxygen Plant |
1998 |
Assembly;BD,DD
& Fabrication,
Start up |
Hyundai Vinashin Shipyard
Vietnam |
Dawin |
| 3 |
PSA Nitrogen
580Nm3/hrx3set |
1992 |
BD & Local fabrication,
Start up |
Kumho
Korea |
NSC |
| 4 |
Hydrogen Plant
42 Nm3/hr |
1990 |
BD & Local
fablication |
Samsung
Korea |
Teledyne |
| 5 |
Nitrogen
Back up
System |
1989 |
BD,DD & Start
up Supervision |
BOCK, Korea |
CEXI |
| 6 |
Oxygen Gas Vaporizer
Steam Heated
20,000Nm3/hr |
1996 |
Basic Design,
Detailed Design & Fab
|
POSCO,
Korea |
Hanjung
CIT |
| 7 |
Hydrogen Purification
System
|
1990 |
BD &
Installation
Start up |
Praxair,
Korea |
Teledyne |
| 8 |
PSA Oxygen
System |
1993 |
BD & Start up
Installation |
Changwon Mater's |
ON-site |
| 9 |
Vessels |
1996 |
BD,DD & Heater Tracing, Test
and Insulation |
KGC,
Incheon |
Gold Star
Machinery |
| 10 |
PSA Oxygen and Nitrogen
Plant |
1987 |
BD, DD,
Fablication &
Erection, Start up |
Saehan Media |
Hanil |
| 11 |
Hydrogen System |
1992 |
Start up, Maintenance |
Masturata Steel |
Kobe Steel |
| 12 |
Hydrogen plant and system |
1989-1993 |
BD, DD, Startup,
Maintenance |
Samsung Electronics
ETRI |
Teledyne |
| 13 |
DME Plant |
2006 |
BD, DD, Fabrication &
Startup |
Korea Gas |
Self |
| 14 |
Gas Supply System
LO2, LN2 |
2006 |
BD, DD & Startup |
Xiamen Hospital
China |
Worfin |
| 15 |
Cryogenic Tanks
250M3 x 4 sets |
2006-2007 |
BD, DD & Startup |
Formosa, Taiwan |
Worfin |
|
|
| |
|
|
|